Turkey Point (621_4)

Turkey Point is a 877.2 MW other interconnection project in Miami Dade, Florida with a current status of operational.

877.2 MWCapacity
OperationalStatus
FPLMarket
OtherTechnology

Project facts

Canonical nameTurkey Point
Queue ID621_4
Statusoperational
Source status(OP) Operating
MarketFPL
TechnologyOther
Capacity877.2 MW
StateFlorida
CountyMiami Dade
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1973-09-01
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.