Turnpike Solar Plant (70223_TPSP1)

Turnpike Solar Plant is a 74.9 MW solar interconnection project in Osceola, Florida with a current status of active.

74.9 MWCapacity
ActiveStatus
FPCMarket
SolarTechnology

Project facts

Canonical nameTurnpike Solar Plant
Queue ID70223_TPSP1
Statusactive
Source status(V) Under construction, more than 50 percent complete
MarketFPC
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyOsceola
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-02-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata