TURON ENERGY STORAGE (1727)

TURON ENERGY STORAGE is a 70.0 MW battery interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Gates - Coalinga #2 Line 70kV.

70.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameTURON ENERGY STORAGE
Queue ID1727
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity70.0 MW
StateCalifornia
CountyFresno
Point of interconnectionGates - Coalinga #2 Line 70kV
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date2020-06-25
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.