Turtle Creek (64547_2)

Turtle Creek is a 264.0 MW gas interconnection project in Sarpy, Nebraska with a current status of operational.

264.0 MWCapacity
OperationalStatus
SWPPMarket
GasTechnology

Project facts

Canonical nameTurtle Creek
Queue ID64547_2
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyGas
Capacity264.0 MW
StateNebraska
CountySarpy
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-06-01
Withdrawn date
Developer
Utility / transmission ownerOmaha Public Power District

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata