Turtle Rock Storage (28INR0080)

Turtle Rock Storage is a 135.6 MW other interconnection project in Freestone, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 13501 Clayhill to 13681 Reed.

135.6 MWCapacity
OperationalStatus
FreestoneMarket
OtherTechnology

Project facts

Canonical nameTurtle Rock Storage
Queue ID28INR0080
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFreestone
TechnologyOther
Capacity135.6 MW
StateTexas
CountyFreestone
Point of interconnectionTap 138 kV 13501 Clayhill to 13681 Reed
Requested (queue) date2024-05-09
Proposed in-service date
Operational date2028-07-02
Withdrawn date
DeveloperTurtle Rock Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata