Twin Rivers Solar, LLC (020330)

Twin Rivers Solar, LLC is a 74.9 MW solar interconnection project in Suwannee, Florida with a current status of active. It is proposed to connect at Chariot Switching Station.

74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameTwin Rivers Solar, LLC
Queue ID020330
Statusactive
Source status12/31/2020 in g
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountySuwannee
Point of interconnectionChariot Switching Station
Requested (queue) date2018-02-20
Proposed in-service date
Operational date
Withdrawn date
DeveloperTwin Rivers Solar, LLC
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata