Twin Tier Power (0026)

Twin Tier Power is a 520.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Watercure-Oakdale 31 Line.

520.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameTwin Tier Power
Queue ID0026
Statuswithdrawn
Source status0
Market
TechnologyGeneration
Capacity520.0 MW
StateNew York
County
Point of interconnectionWatercure-Oakdale 31 Line
Requested (queue) date1999-08-20
Proposed in-service date
Operational date
Withdrawn date
DeveloperTwin Tier Power, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata