Two Egg Solar (IC-558)
Two Egg Solar is a 74.9 MW solar interconnection project in Jackson County, Florida with a current status of operational.
74.9 MWCapacity
OperationalStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | Two Egg Solar |
|---|---|
| Queue ID | IC-558 |
| Status | operational |
| Source status | — |
| Market | FL |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Jackson County |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Southern Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.