Two Rivers Solar (24INR0099)

Two Rivers Solar is a 208.7 MW solar interconnection project in Milam, Texas with a current status of withdrawn.

208.7 MWCapacity
WithdrawnStatus
MilamMarket
SolarTechnology

Project facts

Canonical nameTwo Rivers Solar
Queue ID24INR0099
Statuswithdrawn
Source status—
MarketMilam
TechnologySolar
Capacity208.7 MW
StateTexas
CountyMilam
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-08-27
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30developerTwo Rivers Solar, LLC—low
2026-09-30poi_nameTap 138kV 64 Milano – 32 Robertson—low
2026-09-30phaseSS Completed, FIS Completed, No IA—low
2026-09-30operational_date2029-06-07—medium
2026-09-30withdrawn_date—2026-08-27high
2026-09-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata