Two Rivers Solar (24INR0099)

Two Rivers Solar is a 208.7 MW solar interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at Tap 138kV 64 Milano – 32 Robertson.

208.7 MWCapacity
OperationalStatus
MilamMarket
SolarTechnology

Project facts

Canonical nameTwo Rivers Solar
Queue ID24INR0099
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketMilam
TechnologySolar
Capacity208.7 MW
StateTexas
CountyMilam
Point of interconnectionTap 138kV 64 Milano – 32 Robertson
Requested (queue) date2021-07-27
Proposed in-service date
Operational date2029-06-07
Withdrawn date
DeveloperTwo Rivers Solar Farm, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata