TX Dallas 7750 Dynasty Drive (66516_19500)

TX Dallas 7750 Dynasty Drive is a 2.3 MW solar interconnection project in Dallas, Texas with a current status of active.

2.3 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameTX Dallas 7750 Dynasty Drive
Queue ID66516_19500
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketERCO
TechnologySolar
Capacity2.3 MW
StateTexas
CountyDallas
Point of interconnection—
Requested (queue) date—
Proposed in-service date2026-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerCatalyze Dallas 7750 Dynasty Drive Microgrid, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-01proposed_online_date2026-09-012026-12-01medium
2026-09-02proposed_online_date2026-07-012026-09-01medium
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata