TX15 Limousin Oak Storage (65698_TX15)

TX15 Limousin Oak Storage is a 100.0 MW battery interconnection project in Grimes, Texas with a current status of operational.

100.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameTX15 Limousin Oak Storage
Queue ID65698_TX15
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity100.0 MW
StateTexas
CountyGrimes
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-08-01
Withdrawn date—
Developer—
Utility / transmission ownerKey Capture Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.