TXP Sealy G (15INR0055)

TXP Sealy G is a 142.0 MW gas interconnection project with a current status of withdrawn. It is proposed to connect at 44255 Foster 138kV.

142.0 MWCapacity
WithdrawnStatus
ERCOTMarket
GasTechnology

Project facts

Canonical nameTXP Sealy G
Queue ID15INR0055
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyGas
Capacity142.0 MW
State
County
Point of interconnection44255 Foster 138kV
Requested (queue) date2013-10-22
Proposed in-service date2018-05-01
Operational date
Withdrawn date
DeveloperTXP Holdings
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.