UL Advanced Wind Turbine Test Facility (61589_UT-1)

UL Advanced Wind Turbine Test Facility is a 3.4 MW wind interconnection project in Randall, Texas with a current status of operational.

3.4 MWCapacity
OperationalStatus
SWPPMarket
WindTechnology

Project facts

Canonical nameUL Advanced Wind Turbine Test Facility
Queue ID61589_UT-1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyWind
Capacity3.4 MW
StateTexas
CountyRandall
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2018-07-01
Withdrawn date—
Developer—
Utility / transmission ownerWest Texas A&M University

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.