Union City Storage II (GI-133)

Union City Storage II is a 100.0 MW battery interconnection project in Fulton County, Georgia with a current status of active. It is proposed to connect at Union City substation.

100.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameUnion City Storage II
Queue IDGI-133
Statusactive
Source statusFacilities Study
MarketGA
TechnologyBattery
Capacity100.0 MW
StateGeorgia
CountyFulton County
Point of interconnectionUnion City substation
Requested (queue) date2019-12-11
Proposed in-service date2022-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata