Union Energy Center, LLC is a 116.0 MW battery interconnection project in Putnam, New York with a current status of withdrawn. It is proposed to connect at Union Valley - Croton Falls 115 kV line #991.

116.0 MWCapacity
WithdrawnStatus
HMarket
BatteryTechnology

Project facts

Canonical nameUnion Energy Center, LLC
Queue ID1180
Statuswithdrawn
Source status0
MarketH
TechnologyBattery
Capacity116.0 MW
StateNew York
CountyPutnam
Point of interconnectionUnion Valley - Croton Falls 115 kV line #991
Requested (queue) date2021-05-20
Proposed in-service date2024-12-31
Operational date
Withdrawn date
DeveloperUnion Energy Center, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.