Upper Falls Solar (C24-141)

Upper Falls Solar is a 46.0 MW solar+battery interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at Station 162 - Station 180 115kV, Line 907.

46.0 MWCapacity
WithdrawnStatus
NYISOMarket
Solar+BatteryTechnology

Project facts

Canonical nameUpper Falls Solar
Queue IDC24-141
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar+Battery
Capacity46.0 MW
StateNew York
CountyWyoming
Point of interconnectionStation 162 - Station 180 115kV, Line 907
Requested (queue) date2024-09-09
Proposed in-service date
Operational date
Withdrawn date
DeveloperUpper Falls Solar
Utility / transmission ownerRGE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata