UT Queue Project 2015-G1 — Solar in Kane County, Utah

UT Queue Project 2015-G1 — Solar in Kane County, Utah is a 250.0 MW solar interconnection project in Kane County, Utah with a current status of withdrawn. It is proposed to connect at Glen Canyon Substation.

250.0 MWCapacity
WithdrawnStatus
UTMarket
SolarTechnology

Project facts

Canonical nameUT Queue Project 2015-G1 — Solar in Kane County, Utah
Queue ID2015-G1
Statuswithdrawn
Source statusWithdrawn
MarketUT
TechnologySolar
Capacity250.0 MW
StateUtah
CountyKane County
Point of interconnectionGlen Canyon Substation
Requested (queue) date2015-07-10
Proposed in-service date2019-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata