UT Queue Project 785 — Solar+Battery in Juab, Utah
UT Queue Project 785 — Solar+Battery in Juab, Utah is a 199.0 MW solar+battery interconnection project in Juab, Utah with a current status of active. It is proposed to connect at 345kV Mona Substation.
199.0 MWCapacity
ActiveStatus
UTMarket
Solar+BatteryTechnology
Project facts
| Canonical name | UT Queue Project 785 — Solar+Battery in Juab, Utah |
|---|---|
| Queue ID | 785 |
| Status | active |
| Source status | Active |
| Market | UT |
| Technology | Solar+Battery |
| Capacity | 199.0 MW |
| State | Utah |
| County | Juab |
| Point of interconnection | 345kV Mona Substation |
| Requested (queue) date | 2025-04-14 |
| Proposed in-service date | 2027-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Idaho Power Company |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-24 | phase | FSR | DGIA | low |
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.