UT Queue Project G0326 — Wind in Box Elder, Utah

UT Queue Project G0326 — Wind in Box Elder, Utah is a 42.0 MW wind interconnection project in Box Elder, Utah with a current status of withdrawn. It is proposed to connect at At BPA's 138 kV Bridge Substation.

42.0 MWCapacity
WithdrawnStatus
UTMarket
WindTechnology

Project facts

Canonical nameUT Queue Project G0326 — Wind in Box Elder, Utah
Queue IDG0326
Statuswithdrawn
Source statusWITHDRAWN
MarketUT
TechnologyWind
Capacity42.0 MW
StateUtah
CountyBox Elder
Point of interconnectionAt BPA's 138 kV Bridge Substation
Requested (queue) date2008-05-05
Proposed in-service date2010-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata