UT Queue Project PIS027 — Solar in Utah, Utah

UT Queue Project PIS027 — Solar in Utah, Utah is a 150.0 MW solar interconnection project in Utah, Utah with a current status of active. It is proposed to connect at Mercer substation.

150.0 MWCapacity
ActiveStatus
UTMarket
SolarTechnology

Project facts

Canonical nameUT Queue Project PIS027 — Solar in Utah, Utah
Queue IDPIS027
Statusactive
Source statusIn Progress
MarketUT
TechnologySolar
Capacity150.0 MW
StateUtah
CountyUtah
Point of interconnectionMercer substation
Requested (queue) date2022-07-16
Proposed in-service date2025-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata