UT Queue Project PIS038 — Solar+Battery in Cache, Utah

UT Queue Project PIS038 — Solar+Battery in Cache, Utah is a 150.0 MW solar+battery interconnection project in Cache, Utah with a current status of withdrawn. It is proposed to connect at Bridgerland-Cache transmission line.

150.0 MWCapacity
WithdrawnStatus
UTMarket
Solar+BatteryTechnology

Project facts

Canonical nameUT Queue Project PIS038 — Solar+Battery in Cache, Utah
Queue IDPIS038
Statuswithdrawn
Source statusWithdrawn
MarketUT
TechnologySolar+Battery
Capacity150.0 MW
StateUtah
CountyCache
Point of interconnectionBridgerland-Cache transmission line
Requested (queue) date2023-05-10
Proposed in-service date2026-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata