UT Queue Project PIS039 — Battery in Salt Lake, Utah

UT Queue Project PIS039 — Battery in Salt Lake, Utah is a 110.0 MW battery interconnection project in Salt Lake, Utah with a current status of withdrawn. It is proposed to connect at Lee Creek substation.

110.0 MWCapacity
WithdrawnStatus
UTMarket
BatteryTechnology

Project facts

Canonical nameUT Queue Project PIS039 — Battery in Salt Lake, Utah
Queue IDPIS039
Statuswithdrawn
Source statusWithdrawn
MarketUT
TechnologyBattery
Capacity110.0 MW
StateUtah
CountySalt Lake
Point of interconnectionLee Creek substation
Requested (queue) date2023-05-12
Proposed in-service date2025-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata