UT Queue Project PIS068 — Solar+Battery in Tooele, Utah

UT Queue Project PIS068 — Solar+Battery in Tooele, Utah is a 125.0 MW solar+battery interconnection project in Tooele, Utah with a current status of withdrawn. It is proposed to connect at Clover – Limber transmission line.

125.0 MWCapacity
WithdrawnStatus
UTMarket
Solar+BatteryTechnology

Project facts

Canonical nameUT Queue Project PIS068 — Solar+Battery in Tooele, Utah
Queue IDPIS068
Statuswithdrawn
Source statusWithdrawn
MarketUT
TechnologySolar+Battery
Capacity125.0 MW
StateUtah
CountyTooele
Point of interconnectionClover – Limber transmission line
Requested (queue) date2024-06-14
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata