UT Queue Project PIS106 — Solar+Battery in Miller, Utah

UT Queue Project PIS106 — Solar+Battery in Miller, Utah is a 75.0 MW solar+battery interconnection project in Miller, Utah with a current status of active. It is proposed to connect at Clear Lake substation.

75.0 MWCapacity
ActiveStatus
UTMarket
Solar+BatteryTechnology

Project facts

Canonical nameUT Queue Project PIS106 — Solar+Battery in Miller, Utah
Queue IDPIS106
Statusactive
Source statusIn Progress
MarketUT
TechnologySolar+Battery
Capacity75.0 MW
StateUtah
CountyMiller
Point of interconnectionClear Lake substation
Requested (queue) date2025-12-18
Proposed in-service date2027-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata