UT Queue Project PIS115 — Other in Box Elder, Utah

UT Queue Project PIS115 — Other in Box Elder, Utah is a 500.0 MW other interconnection project in Box Elder, Utah with a current status of active. It is proposed to connect at Bridgerland substation.

500.0 MWCapacity
ActiveStatus
UTMarket
OtherTechnology

Project facts

Canonical nameUT Queue Project PIS115 — Other in Box Elder, Utah
Queue IDPIS115
Statusactive
Source statusIn Progress
MarketUT
TechnologyOther
Capacity500.0 MW
StateUtah
CountyBox Elder
Point of interconnectionBridgerland substation
Requested (queue) date2026-05-20
Proposed in-service date2030-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata