UT Queue Project PIS115 — Other in Box Elder, Utah
UT Queue Project PIS115 — Other in Box Elder, Utah is a 500.0 MW other interconnection project in Box Elder, Utah with a current status of active. It is proposed to connect at Bridgerland substation.
500.0 MWCapacity
ActiveStatus
UTMarket
OtherTechnology
Project facts
| Canonical name | UT Queue Project PIS115 — Other in Box Elder, Utah |
|---|---|
| Queue ID | PIS115 |
| Status | active |
| Source status | In Progress |
| Market | UT |
| Technology | Other |
| Capacity | 500.0 MW |
| State | Utah |
| County | Box Elder |
| Point of interconnection | Bridgerland substation |
| Requested (queue) date | 2026-05-20 |
| Proposed in-service date | 2030-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata