UTC - P&WA (158)

UTC - P&WA is a 7.5 MW gas interconnection project in Middlesex, Connecticut with a current status of operational. It is proposed to connect at CL&P P&WA Substation.

7.5 MWCapacity
OperationalStatus
CTMarket
GasTechnology

Project facts

Canonical nameUTC - P&WA
Queue ID158
Statusoperational
Source statusC
MarketCT
TechnologyGas
Capacity7.5 MW
StateConnecticut
CountyMiddlesex
Point of interconnectionCL&P P&WA Substation
Requested (queue) date2006-06-21
Proposed in-service date
Operational date2007-12-21
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata