Uvalde Solar 2 (66309_UVPV2)

Uvalde Solar 2 is a 300.0 MW solar interconnection project in Uvalde, Texas with a current status of active.

300.0 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameUvalde Solar 2
Queue ID66309_UVPV2
Statusactive
Source status(P) Planned for installation, but regulatory approvals not initiated
MarketERCO
TechnologySolar
Capacity300.0 MW
StateTexas
CountyUvalde
Point of interconnection—
Requested (queue) date—
Proposed in-service date2027-12-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerRWE Clean Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata