VA Queue Project LGE-GIS-2021-026 — Solar in Wise County, Virginia

VA Queue Project LGE-GIS-2021-026 — Solar in Wise County, Virginia is a 20.0 MW solar interconnection project in Wise County, Virginia with a current status of withdrawn. It is proposed to connect at Dorchester - St Paul 69 kV line.

20.0 MWCapacity
WithdrawnStatus
VAMarket
SolarTechnology

Project facts

Canonical nameVA Queue Project LGE-GIS-2021-026 — Solar in Wise County, Virginia
Queue IDLGE-GIS-2021-026
Statuswithdrawn
Source statusWithdrawn
MarketVA
TechnologySolar
Capacity20.0 MW
StateVirginia
CountyWise County
Point of interconnectionDorchester - St Paul 69 kV line
Requested (queue) date2021-10-25
Proposed in-service date2023-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: lgeku-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata