VA Queue Project LGE-GIS-2022-008 — Solar+Battery in Lee County, Virginia
VA Queue Project LGE-GIS-2022-008 — Solar+Battery in Lee County, Virginia is a 45.0 MW solar+battery interconnection project in Lee County, Virginia with a current status of withdrawn. It is proposed to connect at Pocket North Substation 161 kV bus.
45.0 MWCapacity
WithdrawnStatus
VAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | VA Queue Project LGE-GIS-2022-008 — Solar+Battery in Lee County, Virginia |
|---|---|
| Queue ID | LGE-GIS-2022-008 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | VA |
| Technology | Solar+Battery |
| Capacity | 45.0 MW |
| State | Virginia |
| County | Lee County |
| Point of interconnection | Pocket North Substation 161 kV bus |
| Requested (queue) date | 2022-09-07 |
| Proposed in-service date | 2024-09-10 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Louisville Gas & Electric and Kentucky Utilities Energy |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: lgeku-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.