Val Vista Grid BESS 1 (22INR0387)

Val Vista Grid BESS 1 is a 209.3 MW other interconnection project in Hidalgo, Texas with a current status of operational. It is proposed to connect at Tap 345kV 8383 North Edinburg - 80137 Stewart Road.

209.3 MWCapacity
OperationalStatus
HidalgoMarket
OtherTechnology

Project facts

Canonical nameVal Vista Grid BESS 1
Queue ID22INR0387
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketHidalgo
TechnologyOther
Capacity209.3 MW
StateTexas
CountyHidalgo
Point of interconnectionTap 345kV 8383 North Edinburg - 80137 Stewart Road
Requested (queue) date2020-08-04
Proposed in-service date
Operational date2029-03-30
Withdrawn date
DeveloperVal Vista Grid, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata