Valcrest BESS (28INR0465)

Valcrest BESS is a 154.2 MW other interconnection project in Galveston, Texas with a current status of operational. It is proposed to connect at tap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8.

154.2 MWCapacity
OperationalStatus
GalvestonMarket
OtherTechnology

Project facts

Canonical nameValcrest BESS
Queue ID28INR0465
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGalveston
TechnologyOther
Capacity154.2 MW
StateTexas
CountyGalveston
Point of interconnectiontap 138 kV 43500 WEBSTR_B138A - 48403 W_GALV01TP_8
Requested (queue) date2025-12-17
Proposed in-service date
Operational date2028-12-31
Withdrawn date
DeveloperFlexen USA LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata