Vallecito (62801_ORN34)

Vallecito is a 10.0 MW battery interconnection project in Santa Barbara, California with a current status of operational.

10.0 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameVallecito
Queue ID62801_ORN34
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity10.0 MW
StateCalifornia
CountySanta Barbara
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-02-01
Withdrawn date—
Developer—
Utility / transmission ownerViridity Energy Solutions, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata