Vallecito Hydroelectric (50206_GEN2)

Vallecito Hydroelectric is a 2.5 MW other interconnection project in La Plata, Colorado with a current status of operational.

2.5 MWCapacity
OperationalStatus
WACMMarket
OtherTechnology

Project facts

Canonical nameVallecito Hydroelectric
Queue ID50206_GEN2
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologyOther
Capacity2.5 MW
StateColorado
CountyLa Plata
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1989-05-01
Withdrawn date
Developer
Utility / transmission ownerPtarmigan Res & Engy Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata