Valley City 115 kV (GEN-2016-007)

Valley City 115 kV is a 100.0 MW wind interconnection project in Barnes, North Dakota with a current status of withdrawn. It is proposed to connect at Valley City 115 kV.

100.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameValley City 115 kV
Queue IDGEN-2016-007
Statuswithdrawn
Source statusTERMINATED
MarketND
TechnologyWind
Capacity100.0 MW
StateNorth Dakota
CountyBarnes
Point of interconnectionValley City 115 kV
Requested (queue) date2016-03-28
Proposed in-service date2024-12-31
Operational date
Withdrawn date2024-09-06
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.