Vandalia 69 kV (AG1-207)

Vandalia 69 kV is a 85.0 MW battery interconnection project in Montgomery, Ohio with a current status of active.

85.0 MWCapacity
ActiveStatus
Market
BatteryTechnology

Project facts

Canonical nameVandalia 69 kV
Queue IDAG1-207
Statusactive
Source statusEngineering and Procurement
Market
TechnologyBattery
Capacity85.0 MW
StateOhio
CountyMontgomery
Point of interconnection
Requested (queue) date2020-09-22
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata