Vaughn Energy Storage (26INR0200)

Vaughn Energy Storage is a 200.6 MW other interconnection project in Grimes, Texas with a current status of operational. It is proposed to connect at 13 Keith 138kV.

200.6 MWCapacity
OperationalStatus
GrimesMarket
OtherTechnology

Project facts

Canonical nameVaughn Energy Storage
Queue ID26INR0200
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketGrimes
TechnologyOther
Capacity200.6 MW
StateTexas
CountyGrimes
Point of interconnection13 Keith 138kV
Requested (queue) date2023-08-21
Proposed in-service date
Operational date2027-12-31
Withdrawn date
DeveloperVaughn Battery Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata