Velociraptor BESS II (28INR0323)

Velociraptor BESS II is a 246.1 MW other interconnection project in Ector, Texas with a current status of operational. It is proposed to connect at Tap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV.

246.1 MWCapacity
OperationalStatus
EctorMarket
OtherTechnology

Project facts

Canonical nameVelociraptor BESS II
Queue ID28INR0323
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketEctor
TechnologyOther
Capacity246.1 MW
StateTexas
CountyEctor
Point of interconnectionTap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV
Requested (queue) date2025-05-27
Proposed in-service date—
Operational date2029-12-01
Withdrawn date—
DeveloperVelociraptor BESS II, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31developerGreyhound BESS 3 LLCVelociraptor BESS II, LLClow
2026-08-31poi_name#11028 Odessa EHV SW - #11010 Wolf Switch 345KTap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KVlow
2026-08-31capacity_mw246.21246.12high
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata