Velveteen Solar III (29INR0226)
Velveteen Solar III is a 200.7 MW solar interconnection project in Baylor, Texas with a current status of operational. It is proposed to connect at Tap into 6076 FOXTAIL- 6100 OKLAUNION.
200.7 MWCapacity
OperationalStatus
BaylorMarket
SolarTechnology
Project facts
| Canonical name | Velveteen Solar III |
|---|---|
| Queue ID | 29INR0226 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Baylor |
| Technology | Solar |
| Capacity | 200.7 MW |
| State | Texas |
| County | Baylor |
| Point of interconnection | Tap into 6076 FOXTAIL- 6100 OKLAUNION |
| Requested (queue) date | 2026-01-13 |
| Proposed in-service date | — |
| Operational date | 2029-12-15 |
| Withdrawn date | — |
| Developer | Velveteen Solar II, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.