Verde Light Community Solar, LLC (532)

Verde Light Community Solar, LLC is a 3.0 MW solar interconnection project in Malheur, Oregon with a current status of operational. It is proposed to connect at ONTO 12.47kV Feeder.

3.0 MWCapacity
OperationalStatus
ORMarket
SolarTechnology

Project facts

Canonical nameVerde Light Community Solar, LLC
Queue ID532
Statusoperational
Source statusIn Service
MarketOR
TechnologySolar
Capacity3.0 MW
StateOregon
CountyMalheur
Point of interconnectionONTO 12.47kV Feeder
Requested (queue) date2018-05-03
Proposed in-service date
Operational date2020-12-31
Withdrawn date
DeveloperVerde Light Community Solar, LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata