Vernon-Sugar Loaf #2 115 kV (AE2-237)

Vernon-Sugar Loaf #2 115 kV is a 107.0 MW battery interconnection project in Sussex, New Jersey with a current status of withdrawn.

107.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameVernon-Sugar Loaf #2 115 kV
Queue IDAE2-237
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity107.0 MW
StateNew Jersey
CountySussex
Point of interconnection
Requested (queue) date2019-03-22
Proposed in-service date2022-03-01
Operational date
Withdrawn date2022-07-27
Developer
Utility / transmission ownerJCPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.