Verogy - Thrall Rd, East Windsor (1200)

Verogy - Thrall Rd, East Windsor is a 4.0 MW solar interconnection project in Hartford, Connecticut with a current status of withdrawn. It is proposed to connect at Rockville 14W or Barbour Hill 23J.

4.0 MWCapacity
WithdrawnStatus
CTMarket
SolarTechnology

Project facts

Canonical nameVerogy - Thrall Rd, East Windsor
Queue ID1200
Statuswithdrawn
Source statusW
MarketCT
TechnologySolar
Capacity4.0 MW
StateConnecticut
CountyHartford
Point of interconnectionRockville 14W or Barbour Hill 23J
Requested (queue) date2021-12-28
Proposed in-service date2023-07-01
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata