Vertus Energy Storage 2 (28INR0490)

Vertus Energy Storage 2 is a 204.9 MW other interconnection project in Galveston, Texas with a current status of operational. It is proposed to connect at 38830 TNMAINLAND1 138 KV.

204.9 MWCapacity
OperationalStatus
GalvestonMarket
OtherTechnology

Project facts

Canonical nameVertus Energy Storage 2
Queue ID28INR0490
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketGalveston
TechnologyOther
Capacity204.9 MW
StateTexas
CountyGalveston
Point of interconnection38830 TNMAINLAND1 138 KV
Requested (queue) date2026-01-26
Proposed in-service date
Operational date2028-02-15
Withdrawn date
DeveloperVERTUS ENERGY STORAGE LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata