Vertus Energy Storage 2 (28INR0490)
Vertus Energy Storage 2 is a 204.9 MW other interconnection project in Galveston, Texas with a current status of operational. It is proposed to connect at 38830 TNMAINLAND1 138 KV.
204.9 MWCapacity
OperationalStatus
GalvestonMarket
OtherTechnology
Project facts
| Canonical name | Vertus Energy Storage 2 |
|---|---|
| Queue ID | 28INR0490 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Galveston |
| Technology | Other |
| Capacity | 204.9 MW |
| State | Texas |
| County | Galveston |
| Point of interconnection | 38830 TNMAINLAND1 138 KV |
| Requested (queue) date | 2026-01-26 |
| Proposed in-service date | — |
| Operational date | 2028-02-15 |
| Withdrawn date | — |
| Developer | VERTUS ENERGY STORAGE LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.