Vial BESS (67784_GRS11)
Vial BESS is a 141.4 MW battery interconnection project in Hill, Texas with a current status of active.
141.4 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology
Project facts
| Canonical name | Vial BESS |
|---|---|
| Queue ID | 67784_GRS11 |
| Status | active |
| Source status | (L) Regulatory approvals pending. Not under construction |
| Market | ERCO |
| Technology | Battery |
| Capacity | 141.4 MW |
| State | Texas |
| County | Hill |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2027-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Gransolar Texas Twenty Two |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata