Victory Ellis – Gas is a 465.9 MW gas interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT.

465.9 MWCapacity
OperationalStatus
EllisMarket
GasTechnology

Project facts

Canonical nameVictory Ellis – Gas
Queue ID29INR0264
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketEllis
TechnologyGas
Capacity465.9 MW
StateTexas
CountyEllis
Point of interconnectionTap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT
Requested (queue) date2026-07-08
Proposed in-service date—
Operational date2030-09-28
Withdrawn date—
DeveloperVictory Ellis, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30poi_name2466 BIGONION_5 345kVTap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKTlow
2026-09-30phaseSS Started, FIS Started, No IASS Completed, FIS Started, No IAlow
2026-09-30operational_date—2030-09-28medium
2026-09-30proposed_online_date2028-12-31—medium
2026-09-30statusactiveoperationalhigh
2026-08-31poi_nameBus# 2466; BIGSW, 345 kV, 345 kV bus in switchyard; GPS Location: 32.30347, -96.753602466 BIGONION_5 345kVlow
2026-08-31capacity_mw480.0465.92high
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata