Victory Ellis–BESS (28INR0529)
Victory Ellis–BESS is a 453.0 MW other interconnection project in Ellis, Texas with a current status of operational. It is proposed to connect at Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT.
453.0 MWCapacity
OperationalStatus
EllisMarket
OtherTechnology
Project facts
| Canonical name | Victory Ellis–BESS |
|---|---|
| Queue ID | 28INR0529 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Ellis |
| Technology | Other |
| Capacity | 453.0 MW |
| State | Texas |
| County | Ellis |
| Point of interconnection | Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT |
| Requested (queue) date | 2026-07-10 |
| Proposed in-service date | — |
| Operational date | 2030-09-28 |
| Withdrawn date | — |
| Developer | Victory Ellis, LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | poi_name | 2466 BIGSW 345kV | Tap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elrod Switch (3159) DCKT | low |
| 2026-09-30 | phase | SS Started, FIS Started, No IA | SS Completed, FIS Started, No IA | low |
| 2026-09-30 | operational_date | — | 2030-09-28 | medium |
| 2026-09-30 | proposed_online_date | 2028-12-31 | — | medium |
| 2026-09-30 | status | active | operational | high |
| 2026-08-31 | new_project | — | active | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata