Ville Platte - West Form 230 kV Line Tap (J1236)

Ville Platte - West Form 230 kV Line Tap is a 50.0 MW battery interconnection project in St. Landry Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Ville Platte - West Form 230 kV Line Tap.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameVille Platte - West Form 230 kV Line Tap
Queue IDJ1236
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateLouisiana
CountySt. Landry Parish
Point of interconnectionVille Platte - West Form 230 kV Line Tap
Requested (queue) date2019-04-29
Proposed in-service date2022-10-30
Operational date2022-10-30
Withdrawn date2020-08-04
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata