Vineyard Northeast (C24-009)

Vineyard Northeast is a 884.0 MW wind interconnection project in Nassau, New York with a current status of withdrawn. It is proposed to connect at Ruland Rd 345kV substation..

884.0 MWCapacity
WithdrawnStatus
NYISOMarket
WindTechnology

Project facts

Canonical nameVineyard Northeast
Queue IDC24-009
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologyWind
Capacity884.0 MW
StateNew York
CountyNassau
Point of interconnectionRuland Rd 345kV substation.
Requested (queue) date2024-08-01
Proposed in-service date
Operational date
Withdrawn date
DeveloperVineyard Northeast LLC
Utility / transmission ownerNYPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.