Vineyard Offshore Wind is a 800.0 MW wind interconnection project with a current status of operational. It is proposed to connect at 115 kV Barnstable Substation.

800.0 MWCapacity
OperationalStatus
SEMAMarket
WindTechnology

Project facts

Canonical nameVineyard Offshore Wind
Queue ID624
Statusoperational
Source statusC
MarketSEMA
TechnologyWind
Capacity800.0 MW
StateMassachusetts
County
Point of interconnection115 kV Barnstable Substation
Requested (queue) date2016-11-09
Proposed in-service date
Operational date2026-04-24
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata