Vineyard Substation (L0522)

Vineyard Substation is a 14.0 MW other interconnection project in Franklin, Washington with a current status of active. It is proposed to connect at Benton-Franklin #1 or #2 115 kV transmission line.

14.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameVineyard Substation
Queue IDL0522
Statusactive
Source statusSTUDY
MarketWA
TechnologyOther
Capacity14.0 MW
StateWashington
CountyFranklin
Point of interconnectionBenton-Franklin #1 or #2 115 kV transmission line
Requested (queue) date2022-03-22
Proposed in-service date2025-03-18
Operational date
Withdrawn date
DeveloperBig Bend Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata