Vineyard Wind II (1011)

Vineyard Wind II is a 1,403.0 MW wind interconnection project in Suffolk, New York with a current status of withdrawn. It is proposed to connect at Ruland Road 138kV.

1,403.0 MWCapacity
WithdrawnStatus
KMarket
WindTechnology

Project facts

Canonical nameVineyard Wind II
Queue ID1011
Statuswithdrawn
Source status0
MarketK
TechnologyWind
Capacity1,403.0 MW
StateNew York
CountySuffolk
Point of interconnectionRuland Road 138kV
Requested (queue) date2020-04-30
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperOCS-A 0522, LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata